Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
The Boathouse Retaining Wall Rehabilitation
The Boathouse is a popular summertime location for the citizens of Guelph, Ontario. In 2024, Harbourside was tasked with the rehabilitation of its retaining wall adjacent to the Speed River. The project included additional design services to rejuvenate the surrounding area as well. In 2026 the project won the OPWA award for structures under $2-million.
Red Head Harbour Planning and Breakwater
Following the damage sustained by Hurricane Fiona, Harbourside Engineering was contracted by the Department of Fisheries and Oceans to undertake the harbour planning and refurbishment of Red Head Harbour. This would include the reconstruction of a breakwater structure.
Pointe-Sapin Shore Protection
Structures 404 and 405 at Pointe-Sapin wharf were deteriorated crib structures that required repair or replacement. Harbourside was engaged by the Department of Fisheries and Oceans, Small Craft Harbours to complete the planning, design, and contract administration for the rehabilitation of the two timber crib structures. Harbourside also upgraded the shore protection near the entrance to the Pointe-Sapin Harbour, New Brunswick, with additional breakwater along the easter face of the wharf to protect the harbour from the increased effects of climate change.
Petit Cap Wharf Reconstruction and Expansion
Small craft harbours are the heart of the Maritimes. In 2021, Harbourside was hired by DFO Small Craft Harbours through a Standing Offer to develop two separate tender packages. These were created in order to design and replace the existing marginal wharf structure for the Petit-Cap Harbour, New Brunswick.
Blandford-Tancook Ferry Engineering Services
Harbourside was engaged by Nova Scotia Public Works to act as the prime consultant in the design and construction of three new ferry wharf facilities for the new Blandford-Tancook Roll-On-Roll-Off (Ro-Ro) vehicle and passenger ferry. These would serve to connect Big Tancook Island and Little Tancook Island to Mainland Nova Scotia at Blandford. These ferries allow for greater connectivity within the province and help to provide more reliable transportation services for Chester, Tancook, and Blandford.
Little Harbour (L’Ardoise) Reconstruction
Harbourside Engineering was engaged as the prime consultant for the reconstruction of the existing timber cribwork marginal wharf on the west side of Little Harbour (L’Ardoise) in Richmond County, Nova Scotia. The services provided can be broken down into distinct phases: pre-design services, design services, tender support, contract administration, and construction services. Design work for this project was completed in February 2020, and construction finished in November 2023.
Hampton Structures 404 & 603 Reconstruction
In 2022, the Department of Fisheries and Oceans, Small Craft Harbours, noted that structure 404 (a pier) and structure 603 (a marginal wharf) were in poor condition at Hampton Harbour, Nova Scotia. Harbourside was hired to design the reconstructed structures, including the removal and reconstruction of the armour stone revetment at Structure 603 and tie-ins to existing structures on three sides. The design was completed in February 2023, and a final structural tender package was prepared in April 2023.
Feltzen South EII Reconstruction
Harbourside Engineering Consultants was hired by Public Works and Government Services Canada on behalf of the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for the Feltzen South Ell Wharf in Lunenburg County, Nova Scotia. The reconstruction of the wharf and the added breakwater help support local fishers by modernizing and updating outdated infrastructure. Construction was completed during the first two weeks of lobster fishing season, the harbour’s busiest months, in December 2022.
Saint-Édouard-De-Kent Containment Cell
A new containment cell for dredge spoils was needed at the Saint-Édouard-de-Kent Harbour in Kent County, New Brunswick. Public Services and Procurement and the Department of Fisheries and Oceans, Small Craft Harbours, retained Harbourside Engineering Consultants for this project in 2021. The initial work included a topographic survey of the site, a geotechnical investigation inclusive of test pits, collection of soils samples, and the development of a tender package to replace the existing containment cell.
Darnley Wharf and Breakwater Reconstruction
Harbourside was engaged as the prime consultant by the Department of Fisheries and Oceans, Small Craft Harbours, for the design of a replacement structure for an existing marginal wharf, the partial replacement of a breakwater, the design of an abutment for the gangway to the floating docks, and the design of a new anchorage for the floating docks in Darnley, Prince Edward Island. The main objectives were to divest these structures to the Harbour Authority, minimize the impact on adjacent landowners throughout construction, and maintain the uninterrupted operation of the fish processing plant.
Burgoyne Bridge Erection
The Burgoyne bridge is one of three crossings that span Twelve Mile Creek. It is an important transportation artery for the Niagara area, Ontario. By 2010, it was recommended that the bridge be replaced, and Harbourside was contacted by Pomerleau and Structal as a subconsultant to handle construction phasing and unique launch and design approaches, which began in 2014. After completion in 2016, Harbourside was awarded the Award of Excellence at the Canadian Consulting Engineering Awards Gala for the project in 2017.
Maritime Link
The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in 2017 to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. Harbourside worked on several phases of the Maritime Link Project, with involvement beginning with planning and extended to the completion of construction. The connection provided by the Maritime Link is one more step towards a greener future for Nova Scotia, who intends to be carbon net zero by 2035.