Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Fort York Pedestrian Bridge
Bridge Christian Allaire Bridge Christian Allaire

Fort York Pedestrian Bridge

ES Fox was awarded the contract for the bridge steel superstructure erections of the Fort York pedestrian bridges and retained Harbourside to complete the erection engineering.

Read More
Canada Creek Small Craft Harbour Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Canada Creek Small Craft Harbour Reconstruction

Harbourside Engineering was engaged by Public Services and Procurement Canada to deliver the full redevelopment of the Canada Creek Small Craft Harbour—a small craft harbour serving the local fishing community. The existing facility was in severe disrepair and required a complete reconstruction to support federal divestiture plans.

Read More
Naufrage Breakwater Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Naufrage Breakwater Reconstruction

Harbourside was engaged as the prime consultant to complete the design of a new breakwater to replace the existing breakwater structure. The existing breakwater was a timber piled structure, a concrete deck and armour stone below and at the end. The new structure is a steel sheet pile wall with a concrete deck and armour stone behind and at the end of the new breakwater.

Read More
Hall’s Harbour Wharf Replacement
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Hall’s Harbour Wharf Replacement

Harbourside Engineering Consultants was hired to design a replacement structure for Hall’s Harbour wharf: a ground-out fishing wharf that is also heavily used by tourists during the summer and fall. Hall’s Harbour is also a popular location for observing tidal changes of the Bay of Fundy. Due to structural conditions, the existing wharf at this facility was considered unsafe for use.

Read More
Naufrage Breakwater
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Naufrage Breakwater

Harbourside Engineering was hired by DFO Small Craft Harbours to manage the demolition and reconstruction of the previous breakwater at Naufrage on Prince Edward Island. The department of Fisheries and Oceans Canada also hired Harbourside Engineering to complete the structural design work.

Read More
Cornwall Interchange Design
Road Upgrades, Highways and Roundabouts Christian Allaire Road Upgrades, Highways and Roundabouts Christian Allaire

Cornwall Interchange Design

In 2016, the Prince Edward Island Government requested funding from Ottawa to redirect the Trans-Canada Highway around the town of Cornwall.  In the span of just 4 years (2009 to 2013), the area saw 159 collisions (none of them fatal). The project was to be completed in two phases. Enter Harbourside Transportation Consultants!

Read More
Galway Road Network Design
Road Upgrades, Highways and Roundabouts Christian Allaire Road Upgrades, Highways and Roundabouts Christian Allaire

Galway Road Network Design

In 2015, Harbourside Transportation Consultants was hired to provide the consulting design services to assist with the creation of three multi-lane roundabouts. These were to be constructed in the Galway development in St. John’s. HTC’s scope of work as transportation engineers was for preliminary and detailed design of the three roundabouts and the roadway between roundabouts ‘A’ and ‘B’.

Read More
City of Corner Brook Traffic Signal Systems
Transportation Design Christian Allaire Transportation Design Christian Allaire

City of Corner Brook Traffic Signal Systems

The City of Corner Brook retained Harbourside Transportation Consultants (HTC) in November of 2017 to complete a comprehensive evaluation of the City’s traffic signal systems. Relying on our expertise as transportation engineers, the town’s goal for the study was to document existing conditions at each traffic signal system and to recommend upgrades as required.

Read More
St. Peter’s Swing Bridge Replacement
Bridge Christian Allaire Bridge Christian Allaire

St. Peter’s Swing Bridge Replacement

Harbourside Engineering Consultants (HEC) was contracted by Dexter Construction to provide specialist structural construction engineering services for the replacement of the existing St Peter’s Swing Bridge in Cape Breton, NS.

Read More
Burgoyne Bridge Erection
Bridge Christian Allaire Bridge Christian Allaire

Burgoyne Bridge Erection

Originally built in 1915, by 2010, it was recommended that the Burgoyne bridge be replaced. Design began in 2014, and construction was completed by 2016. Harbourside was contracted by Pomerleau and Structal as a subconsultant to handle construction phasing, and unique launch/design approaches. Harbourside also developed the temporary works utilized in this project.

Read More
Maritime Link
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Maritime Link

The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in order to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. This project took shape after engaging with Mi’kmaq stakeholder, various environmental studies, and multiple surveys.

Read More
Karwood Market Area Traffic Study
Traffic Study Christian Allaire Traffic Study Christian Allaire

Karwood Market Area Traffic Study

The Karwood Market and Octagon Pond development areas in the Town of Paradise, NL. have been the subject of several development proposals in recent years. With all the expected construction, Harbourside Transportation Consultants (HTC) was tasked with preparing a Traffic Study to help direct Town staff on the road network improvements that would be required. The traffic study was to cover both development areas over a 5-year and 10-year planning horizon.

Read More