Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Pier 20 West and Pier 21 Wharf Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Pier 20 West and Pier 21 Wharf Reconstruction

Harbourside was retained by the Port of St. John’s to provide engineering services for the Pier 20 West and Pier 21 Wharf Replacement and Upland Development project on the south side of St. John’s Harbour, Newfoundland. The primary objective of the project was the complete replacement of the existing wharves, the demolition of the existing building at the site, and the development of the upland area. Harbourside is providing contract administration and full-time onsite inspection services throughout the construction period.

Read More
Carter’s Point Wharf 410 Reconstruction

Carter’s Point Wharf 410 Reconstruction

Carter’s Point Wharf was an existing deteriorating structure requiring replacement, so Harbourside Engineering was hired by the Department of Fisheries and Oceans, Small Craft Harbours, to design the demolition and reconstruction work with a berlin wall structure. The project also included the engineering design and construction of a new launching ramp and containment cell to store the dredge materials created during construction. The project’s design phase was completed in 2023, with construction wrapping up in 2025.

Read More
Pointe-Sapin Shore Protection
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Pointe-Sapin Shore Protection

Structures 404 and 405 at Pointe-Sapin wharf were deteriorated crib structures that required repair or replacement. Harbourside was engaged by the Department of Fisheries and Oceans, Small Craft Harbours to complete the planning, design, and contract administration for the rehabilitation of the two timber crib structures. Harbourside also upgraded the shore protection near the entrance to the Pointe-Sapin Harbour, New Brunswick, with additional breakwater along the easter face of the wharf to protect the harbour from the increased effects of climate change.

Read More
Halifax International Airport Stand-by Parking Lot
Parking and Pavement, Geotechnical Investigation Christian Allaire Parking and Pavement, Geotechnical Investigation Christian Allaire

Halifax International Airport Stand-by Parking Lot

Harbourside Transportation Consultants were retained by the Halifax International Airport Authority (HIAA) to complete a review of available options for stand-by parking and to develop a solution to provide additional spaces at the largest airport in Nova Scotia, the Halifax Stanfield International Airport. Harbourside Geotechnical Consultants also conducted the geotechnical investigation portion of this project for quality assurance and control at the project site.

Read More
Ocho Rios Berth 2 Rehabilitation
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Ocho Rios Berth 2 Rehabilitation

Harbourside was hired by the Port Authority of Jamaica (PAJ) to perform a condition assessment of the existing Berth 2 at the Ocho Rios Cruise Terminal in Jamaica, which was damaged by a cruise vessel in 2024. Harbourside Engineering Consultants assessed existing site conditions and assisted with design work, and Harbourside Geotechnical Consultants conducted various laboratory services. By condensing the design schedule, Harbourside helped to mitigate the social and economic impact on this region and restore functionality to the terminal as quickly as possible.

Read More
CCG SAR Geotechnical & Servicing Study
Geotechnical Investigation Christian Allaire Geotechnical Investigation Christian Allaire

CCG SAR Geotechnical & Servicing Study

The Canadian Coast Guard engaged Harbourside to support the planning and design of a newly proposed CCG Search and Rescue Station (CCG-SAR) at the Freeport (South Cove) Small Craft Harbour on Long Island, Digby County, Nova Scotia. Along with allowing for larger vessels, the new SAR station will offer upgraded services and a larger dedicated berth. The placement of a new facility within Freeport also helps to make the station more accessible.

Read More
Little Harbour (L’Ardoise) Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Little Harbour (L’Ardoise) Reconstruction

Harbourside Engineering was engaged as the prime consultant for the reconstruction of the existing timber cribwork marginal wharf on the west side of Little Harbour (L’Ardoise) in Richmond County, Nova Scotia. The services provided can be broken down into distinct phases: pre-design services, design services, tender support, contract administration, and construction services. Design work for this project was completed in February 2020, and construction finished in November 2023.

Read More
Cabot Shores: Malpeque Harbour Development
Geotechnical Investigation, Impact Study Christian Allaire Geotechnical Investigation, Impact Study Christian Allaire

Cabot Shores: Malpeque Harbour Development

Malpeque Cove Harbour, Prince Edward Island, is a critical area for fisheries and aquaculture, yet accessing the cove through the Damley Channel has proven dangerous for boat passage for many years. Harbourside Engineering Consultants and MRSB Consulting Services Inc. were engaged to conduct an Economic Impact Study and New Wharf Design for the Malpeque Harbour Authority in 2019. The new Cabot Shores Harbour design will help boost the local economy, increase efficiency, and make life easier for local fishing boats and leisure craft.

Read More
Hampton Structures 404 & 603 Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Hampton Structures 404 & 603 Reconstruction

In 2022, the Department of Fisheries and Oceans, Small Craft Harbours, noted that structure 404 (a pier) and structure 603 (a marginal wharf) were in poor condition at Hampton Harbour, Nova Scotia. Harbourside was hired to design the reconstructed structures, including the removal and reconstruction of the armour stone revetment at Structure 603 and tie-ins to existing structures on three sides. The design was completed in February 2023, and a final structural tender package was prepared in April 2023.

Read More
Highway 104 Twinning (Part 3)

Highway 104 Twinning (Part 3)

The Highway 104 Twinning Project was a Design, Build, Finance, Operate, and Maintain (DBFOM) project, including twinning the 100 series highway between Sutherlands River and Antigonish, Nova Scotia, with new interchanges and bridges. Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of bridge structures, and was awarded the 2025 Lieutenant Governor's Award for Excellence in Engineering for this project.

Read More
Feltzen South EII Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Feltzen South EII Reconstruction

Harbourside Engineering Consultants was hired by Public Works and Government Services Canada on behalf of the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for the Feltzen South Ell Wharf in Lunenburg County, Nova Scotia. The reconstruction of the wharf and the added breakwater help support local fishers by modernizing and updating outdated infrastructure. Construction was completed during the first two weeks of lobster fishing season, the harbour’s busiest months, in December 2022.

Read More
Saint-Édouard-De-Kent Containment Cell
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Saint-Édouard-De-Kent Containment Cell

A new containment cell for dredge spoils was needed at the Saint-Édouard-de-Kent Harbour in Kent County, New Brunswick. Public Services and Procurement and the Department of Fisheries and Oceans, Small Craft Harbours, retained Harbourside Engineering Consultants for this project in 2021. The initial work included a topographic survey of the site, a geotechnical investigation inclusive of test pits, collection of soils samples, and the development of a tender package to replace the existing containment cell.

Read More
Canada Border Services Agency Warehouse

Canada Border Services Agency Warehouse

Harbourside carried out a geotechnical investigation for the new Canada Border Services Agency container examination facility in Halifax, Nova Scotia. The project required multiple specializations, and Harbourside handled the project management in conjunction with the Halifax Port Authority. Harbourside Project Management acted as the owner representative for this project, the associated developments at the PSA maintenance garage, and the South End Container Crane Stowage Foundations, all of which were completed by 2023.

Read More
Pier C Terminal Expansion
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Pier C Terminal Expansion

Harbourside provided geotechnical and site services to the Halifax Port Authority related to the construction of the Pier C Extension for the Port of Halifax’s South End Container Terminal in Halifax, Nova Scotia, from 2018 to 2020. The purpose of the geotechnical investigation was to assess the subsurface soil and bedrock conditions at the site and to provide geotechnical recommendations to aid with the design and construction of the extension. This expansion will help create new jobs and provide further opportunity for growth throughout the Maritimes.

Read More
Darnley Wharf and Breakwater Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Darnley Wharf and Breakwater Reconstruction

Harbourside was engaged as the prime consultant by the Department of Fisheries and Oceans, Small Craft Harbours, for the design of a replacement structure for an existing marginal wharf, the partial replacement of a breakwater, the design of an abutment for the gangway to the floating docks, and the design of a new anchorage for the floating docks in Darnley, Prince Edward Island. The main objectives were to divest these structures to the Harbour Authority, minimize the impact on adjacent landowners throughout construction, and maintain the uninterrupted operation of the fish processing plant.

Read More
Hall’s Harbour Wharf Replacement
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Hall’s Harbour Wharf Replacement

Harbourside Engineering Consultants was hired by Public Works and Government Services on behalf of the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for the Hall’s Harbour Wharf in Nova Scotia. This structure would need to house three commercial fishing vessels, along with requiring updated lighting and electrical systems, as advised by RSEI Consultants Ltd. The project’s engineering design phase was completed by 2015, and construction finished in 2018.

Read More
Maritime Link
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Maritime Link

The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in 2017 to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. Harbourside worked on several phases of the Maritime Link Project, with involvement beginning with planning and extended to the completion of construction. The connection provided by the Maritime Link is one more step towards a greener future for Nova Scotia, who intends to be carbon net zero by 2035.

Read More