Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Pier 20 West and Pier 21 Wharf Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Pier 20 West and Pier 21 Wharf Reconstruction

Harbourside was retained by the Port of St. John’s to provide engineering services for the Pier 20 West and Pier 21 Wharf Replacement and Upland Development project on the south side of St. John’s Harbour, Newfoundland. The primary objective of the project was the complete replacement of the existing wharves, the demolition of the existing building at the site, and the development of the upland area. Harbourside is providing contract administration and full-time onsite inspection services throughout the construction period.

Read More
Margaree Wharf Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Margaree Wharf Reconstruction

Harbourside Engineering was engaged by Small Craft Harbours, Fisheries and Oceans Canada (SCH) to develop the detailed design for the reconstruction of the finger pier wharf in Margaree, Newfoundland following damages during hurricane Fiona in the fall of 2022. The replacement design provides shore power and lighting along the length of the new pier and improvements to the facility to make it more resilient to extreme surge and wave events in the future.

Read More
Carter’s Point Wharf 410 Reconstruction

Carter’s Point Wharf 410 Reconstruction

Carter’s Point Wharf was an existing deteriorating structure requiring replacement, so Harbourside Engineering was hired by the Department of Fisheries and Oceans, Small Craft Harbours, to design the demolition and reconstruction work with a berlin wall structure. The project also included the engineering design and construction of a new launching ramp and containment cell to store the dredge materials created during construction. The project’s design phase was completed in 2023, with construction wrapping up in 2025.

Read More
Simmons Sports Complex
Project Management Christian Allaire Project Management Christian Allaire

Simmons Sports Complex

The Simmons Sports Centre Replacement project in Charlottetown, Prince Edward Island, was aiming for a comprehensive upgrade with emphasis on community engagement and accessibility, and amenities designed for users of all ages. Harbourside took on the role as the Owner's Project Manager in the Design-Bid-Build procurement for the project, acting as the municipality’s representative during all stages of construction. Quality management and follow-up reviews were completed on an ongoing basis to ensure that the construction met specifications.

Read More
Little Harbour (L’Ardoise) Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Little Harbour (L’Ardoise) Reconstruction

Harbourside Engineering was engaged as the prime consultant for the reconstruction of the existing timber cribwork marginal wharf on the west side of Little Harbour (L’Ardoise) in Richmond County, Nova Scotia. The services provided can be broken down into distinct phases: pre-design services, design services, tender support, contract administration, and construction services. Design work for this project was completed in February 2020, and construction finished in November 2023.

Read More
Westport Wharf Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Westport Wharf Reconstruction

Harbourside was engaged as the primary consultant by Small Craft Harbours, Fisheries and Oceans Canada to complete the planning, design, and contract administration for the reconstruction of the wharf in Westport, Newfoundland. After developing the construction documents, Harbourside Engineering completed the initial inspection of the existing structure, then completed all preliminary and detailed design work and tender preparation (including drawings, specifications, and cost estimate) for the replacement structure.

Read More
Highway 104 Twinning (Part 3)

Highway 104 Twinning (Part 3)

The Highway 104 Twinning Project was a Design, Build, Finance, Operate, and Maintain (DBFOM) project, including twinning the 100 series highway between Sutherlands River and Antigonish, Nova Scotia, with new interchanges and bridges. Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of bridge structures, and was awarded the 2025 Lieutenant Governor's Award for Excellence in Engineering for this project.

Read More
Peggy’s Cove Infrastructure Improvements
Road Upgrades, Parking and Pavement Christian Allaire Road Upgrades, Parking and Pavement Christian Allaire

Peggy’s Cove Infrastructure Improvements

Peggy’s Cove is one of Nova Scotia’s most iconic tourist attractions, drawing approximately 700,000 visitors annually. In recent years, the popularity of Peggy’s Cove has created issues in relation to crowds, traffic, servicing, and vehicular and pedestrian infrastructure. To address this, Develop Nova Scotia commissioned the Peggy’s Cove Master Plan, where Harbourside led the design, tendering and construction management of a variety of infrastructure improvements at Peggy’s Cove. Harbourside, in collaboration with Englobe Corporation, was named the 2023 recipient of the Nova Scotia Lieutenant Governor’s Award for Excellence in Engineering for this project.

Read More
Canada Border Services Agency Warehouse

Canada Border Services Agency Warehouse

Harbourside carried out a geotechnical investigation for the new Canada Border Services Agency container examination facility in Halifax, Nova Scotia. The project required multiple specializations, and Harbourside handled the project management in conjunction with the Halifax Port Authority. Harbourside Project Management acted as the owner representative for this project, the associated developments at the PSA maintenance garage, and the South End Container Crane Stowage Foundations, all of which were completed by 2023.

Read More
Pier C Terminal Expansion
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Pier C Terminal Expansion

Harbourside provided geotechnical and site services to the Halifax Port Authority related to the construction of the Pier C Extension for the Port of Halifax’s South End Container Terminal in Halifax, Nova Scotia, from 2018 to 2020. The purpose of the geotechnical investigation was to assess the subsurface soil and bedrock conditions at the site and to provide geotechnical recommendations to aid with the design and construction of the extension. This expansion will help create new jobs and provide further opportunity for growth throughout the Maritimes.

Read More
Hall’s Harbour Wharf Replacement
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Hall’s Harbour Wharf Replacement

Harbourside Engineering Consultants was hired by Public Works and Government Services on behalf of the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for the Hall’s Harbour Wharf in Nova Scotia. This structure would need to house three commercial fishing vessels, along with requiring updated lighting and electrical systems, as advised by RSEI Consultants Ltd. The project’s engineering design phase was completed by 2015, and construction finished in 2018.

Read More