Ron Keefe, P.Eng
Partner, Senior Engineer
Primary Office: Stratford, PEI
Mr. Keefe is a Structural Engineer with more than 14 years of experience delivering complex marine, bridge and heavy civil infrastructure from first concept through to construction. He has contributed to major crossings such as the Hampton Roads Bridges and Tunnel Expansion, the Cross Fraser Tunnel and the Alexandra Bridge Replacement, and has led marine projects end to end, including the Port of Charlottetown Cruise Berth Expansion, where he was involved in planning, design and construction. Ron combines strong technical design with hands-on construction engineering and project management, coordinating clients and contractors to keep projects on schedule and built as designed. His work spans marine structures, industrial facilities, bridges, retaining walls and harbour planning for the cruise, fishing, industrial and recreational boating industries, as well as the inspection and rehabilitation of existing structures.
Ron’s Projects
The Hampton Roads Bridge-Tunnel Expansion is the largest highway construction project in Virginia’s history. Harbourside Engineering has been providing construction engineering services, and continued support for this transformative transportation infrastructure project.
The reconstruction of the North River Slipway was conducted by Harbourside for the Department of Fisheries, Rural Development, and Tourism of Prince Edward Island. After sustaining damage during Hurricane Fiona, Harbourside Engineering completed the detailed structural and civil designs for the new slipway.
Following the damage sustained by Hurricane Fiona, Harbourside Engineering was contracted by the Department of Fisheries and Oceans to undertake the harbour planning and refurbishment of Red Head Harbour. This would include the reconstruction of a breakwater structure.
Harbourside was engaged by the Port of Saint John to assess the Barrack Point Potash Terminal Facility’s infrastructure in Saint John, New Brunswick. This investigation was to evaluate the condition of the structures throughout the facility, to estimate their remaining service life, and to recommend maintenance or rehabilitation work to extend the service life of the facility. After the condition assessment, Harbourside developed a conceptual 25-year Maintenance Plan to extend the service life of the facility to 2048.
Harbourside Engineering Consultants was hired by the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for half of the Georgetown Harbour Wharf pier and a new containment cell in Kings County, Prince Edward Island. Our scope for this project included pre-design services, a site investigation and assessment of the existing conditions, and concept designs through options analysis of the potential wharf structures. The design phase was completed in 2018, and construction finished in the spring of 2024.
Harbourside was engaged by Nova Scotia Public Works to act as the prime consultant in the design and construction of three new ferry wharf facilities for the new Blandford-Tancook Roll-On-Roll-Off (Ro-Ro) vehicle and passenger ferry. These would serve to connect Big Tancook Island and Little Tancook Island to Mainland Nova Scotia at Blandford. These ferries allow for greater connectivity within the province and help to provide more reliable transportation services for Chester, Tancook, and Blandford.
The Port of Charlottetown, Prince Edward Island, has seen significant growth in the cruise ship business and as a result, the Charlottetown Harbour Authority Inc. proceeded with an expansion of the facility. Harbourside worked collaboratively with the CHAI throughout a feasibility study to determine how best to provide a second berthing face for their main industries. This expansion ensures that Charlottetown’s tourism industry can continue to flourish despite environmental and economic change.
Harbourside was engaged as the prime consultant by the Department of Fisheries and Oceans, Small Craft Harbours, for the design of a replacement structure for an existing marginal wharf, the partial replacement of a breakwater, the design of an abutment for the gangway to the floating docks, and the design of a new anchorage for the floating docks in Darnley, Prince Edward Island. The main objectives were to divest these structures to the Harbour Authority, minimize the impact on adjacent landowners throughout construction, and maintain the uninterrupted operation of the fish processing plant.
Harbourside Engineering was engaged by Public Services and Procurement Canada to deliver the full redevelopment of the Canada Creek Small Craft Harbour at the Bay of Fundy, Nova Scotia. Harbourside provided end-to-end engineering services, from conceptual planning through detailed design and construction phase support. The new harbour infrastructure was designed to provide long-term reliability in one of the most challenging marine environments in Atlantic Canada and was given to the Annapolis Valley First Nation in 2019.
The Naufrage Breakwater project in Kings County, Prince Edward Island, included the demolition and re-construction of the existing breakwater structure that protects the run from the harbour out to the Gulf of St. Lawrence. The project was completed for the Department of Fisheries and Oceans, Small Craft Harbours through Public Services and Procurement Canada (PSPC), who hired Harbourside on their behalf to complete the structural design work of a new breakwater to replace the existing structure.
The North Lake Wharf Replacement in Prince Edward Island focused on the replacement of Structure 426P when, in 2014, the existing wharf was considered unsafe for use. Harbourside Engineering Consultants was hired by the Department of Fisheries and Oceans, Small Craft Harbours to design emergency repairs for the existing timber marginal wharf. After the completion of the emergency repairs, Harbourside was then awarded the design of a replacement structure. The project’s design phase wrapped up in 2015, and construction completed in 2017.
In 2011, Gateway Operations began an Operation, Maintenance, and Rehabilitation (OMR) program for the four-lane Route 1 highway in New Brunswick. Part of this program requires the bi-annual inspection of 245 structural assets. Starting in 2014, Harbourside Engineering Consultants has been responsible for the biennial inspections of these structures. This substantial stretch of highway is one of the most important corridors in the province, connecting Canada to the United States, and ending in an interchange with the Trans-Canada Highway.
The Souris Harbour Authority required engineering and consultation and analysis services in 2012 to evaluate the operations and conditions surrounding the Souris Marine Terminal on Prince Edward Island. Harbourside provided reviews and analyses of the site, permitting modernizations and infrastructure improvements, with the main challenge being the extension of service life for the existing infrastructure. In addition, upgrades to the facility may allow for larger vessels to use the terminal, making it a more versatile facility overall.
Awards and Recognition
News and Updates
PortCon, a partnership between Harbourside Engineering and Port Charlottetown, was recently featured in Innovation PEI. Learn more about how marine engineering and port planning come together.
Friday September 19th was the annual Engineers PEI Golf tournament. Naturally, the Harbourside PEI team had to make an appearance on the green, in addition to sponsoring the 8th hole $25,000 prize!