Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Bridge Christian Allaire Bridge Christian Allaire

Meaford Bridge Rehabilitation Program

The 2018 Bridge Rehabilitation Program included the full rehabilitation of two, three-span, concrete rigid arch bridges and three concrete box culverts in the Municipality of Meaford, ON. Harbourside conducted detailed analysis of the structures, oversaw repairs and construction, and worked with environmental representatives to preserve Barn Swallow nesting conditions.

Read More
Road Upgrades, Highways and Roundabouts Christian Allaire Road Upgrades, Highways and Roundabouts Christian Allaire

Galway Road Network Design

Harbourside Transportation Consultants was hired in 2015 to provide the consulting design services for the creation of three multi-lane roundabouts in the Galway development of St. John’s, Newfoundland. The developer, two municipalities, the Provincial Department of Transportation, and a municipal services consultant all had to be kept apprised of the development. The Galway development is now accessible through its Mount Pearl connection, improving transportation throughout the city.

Read More
Transportation Design Christian Allaire Transportation Design Christian Allaire

City of Corner Brook Traffic Signal Systems

The City of Corner Brook, Newfoundland, retained Harbourside Transportation Consultants in November of 2017 to complete a comprehensive evaluation of the city’s traffic signal systems. The systems consisted of fifteen signalized intersections and five signalized pedestrian crossings. The goal of the study was to document existing conditions at each traffic signal system and to recommend upgrades as required. This helped inform the city on next steps for modernizing roadways and improving accessibility throughout the city.

Read More
Bridge Christian Allaire Bridge Christian Allaire

St. Peter’s Swing Bridge Replacement

Harbourside Engineering Consultants was contracted by Dexter Construction to provide specialist structural construction engineering services for the replacement of the existing St Peter’s Swing Bridge in Cape Breton, Nova Scotia. The new structure is a two lane, two span bobtail swing bridge over the historic St. Peter’s Canal. It consists of a cast-in-place reinforced concrete deck supported by twin trapezoidal steel box girders, founded on cast-in-place concrete piers and abutments complete with socketed piles.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Burgoyne Bridge Erection

The Burgoyne bridge is one of three crossings that span Twelve Mile Creek. It is an important transportation artery for the Niagara area, Ontario. By 2010, it was recommended that the bridge be replaced, and Harbourside was contacted by Pomerleau and Structal as a subconsultant to handle construction phasing and unique launch and design approaches, which began in 2014. After completion in 2016, Harbourside was awarded the Award of Excellence at the Canadian Consulting Engineering Awards Gala for the project in 2017.

Read More
Highways and Roundabouts, Bridge Christian Allaire Highways and Roundabouts, Bridge Christian Allaire

Bakers Brook Bridge Replacement Approach

In 2016, Harbourside Transportation Consultants designed the new approach for the replacement of the Bakers Brook Bridge in Gros Morne National Park, Newfoundland, as part of a series of bridge replacements undertaken by Harbourside Engineering Group for Parks Canada. Harbourside completed the design of the vertical and horizontal alignments, from initial concept layouts through to detailed design and tender for the new approach for the Bakers Brook Bridge Replacement.

Read More
Bridge, Highways and Roundabouts Christian Allaire Bridge, Highways and Roundabouts Christian Allaire

Rocky Barachois Bridge Replacement Approach 

Gros Morne, Newfoundland, continued its series of bridge replacement projects with a focus on the Rocky Barachois Bridge in 2016. Harbourside was contracted to provide detailed concept, design, and tender documents. Harbourside Transportation Consultants completed the design of the vertical and horizontal alignments, while Harbourside Geotechnical Consultants investigated the approaches at this site. The design of the new bridge was undertaken by Harbourside Engineering Consultants, making this project a truly comprehensive endeavour for the group.

Read More
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Maritime Link

The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in 2017 to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. Harbourside worked on several phases of the Maritime Link Project, with involvement beginning with planning and extended to the completion of construction. The connection provided by the Maritime Link is one more step towards a greener future for Nova Scotia, who intends to be carbon net zero by 2035.

Read More
Bridge, Highways and Roundabouts Christian Allaire Bridge, Highways and Roundabouts Christian Allaire

Deer Arm Brook Bridge Replacement Approach 

The Deer Arm Brook bridge in Gros Morne, Newfoundland, was slotted for replacement in 2016. Harbourside Transportation Consultants completed the design of the vertical and horizontal alignments, from initial concept layouts through to the detailed design and tender for the new approaches for the bridge replacement. Alternative alignment options for reconstructing the approaches for the new bridge were based on the Transportation Association of Canada Geometric Design Guide for Canadian Roads (TAC) for a design speed of 90 kilometers per hour.

Read More
Bridge, Highways and Roundabouts Christian Allaire Bridge, Highways and Roundabouts Christian Allaire

MacKenzie River Bridge Replacement

Harbourside Transportation Consultants completed the design of the vertical and horizontal alignments, from initial concept layouts through to detailed design and tender, for the new approaches for the MacKenzie Bridge Replacement in 2016. The objective of the alignment design was to be able to construct the new bridge while maintaining traffic on the existing structure and improving the geometry on the roadway approaches. The updated bridge now meets modern guidelines, making it much safer than its predecessor.

Read More
Traffic Study Christian Allaire Traffic Study Christian Allaire

Karwood Market Area Traffic Study

Harbourside Transportation Consultants was engaged by the Town of Paradise, Newfoundland, to prepare a Traffic Study determining required road network improvements for the Karwood Market and Octagon Pond development areas over both a five-year and ten-year planning period. Harbourside’s scope of work included information gathering and data collection, trip generation and distribution, existing capacity analysis, conceptualizing the road network and improvements, future capacity analysis, and active transportation considerations.

Read More
Bridge, Project Management Christian Allaire Bridge, Project Management Christian Allaire

THE BIG LIFT: Angus L. MacDonald Redecking Project

The existing deck and stiffening truss of the Angus L. Macdonald (ALM) Bridge, spanning over the Halifax Harbour in Nova Scotia, were nearing the end of their service life and needed replacement. The project consisted of the design of the new suspended deck and stiffening truss, as well as the analysis of the bridge during erection and the design of the main erection equipment. Harbourside received the Lieutenant Governor’s Award for Excellence in Engineering in 2018 for its work on The Big Lift.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Central Avenue – Accelerated Bridge Construction

The Central Avenue replacement bridge in Fort Erie, Ontario, was designed use the same footprint as the existing bridge. Harbourside was engaged to provide the structural design of four self-stabilizing temporary steel bents which were supported on spread reinforced concrete footings founded on bedrock. With 11,300 vehicles crossing the centrally located bridge daily, it was important to ensure traffic disruptions were kept to a minimum. The completed bridge features two traffic lanes, two bike lanes, and sidewalks.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Seal Island Bridge Emergency Repair

The Seal Island Bridge Structure, or the Great Bras d’Or Crossing, in Victoria County, Nova Scotia, is the third largest bridge span in the province and a crucial link in the Trans-Canada Highway between Sydney and Baddeck. The NS Department of Transportation and Infrastructure Renewal consulted Harbourside to provide structural engineering services for the assessment of the three span continuous main span and rehabilitation of a damaged truss diagonal. Harbourside developed an innovative structural repair with detailed phasing drawings.

Read More
Policy Development, Traffic Study Christian Allaire Policy Development, Traffic Study Christian Allaire

Portugal Cove – St. Philip’s Street Classification

Harbourside Transportation Consultants conducted a comprehensive traffic and roadway study in Portugal Cove, St. Philip’s, Newfoundland. The goal was to have Harbourside re-classify streets as necessary and create a new town map to illustrate the street reclassifications. The reclassification of streets in Portugal Cove, together with the previous traffic study and traffic calming policy, represents a modernization of the town’s transportation infrastructure.

Read More
Policy Development, Transportation Design Christian Allaire Policy Development, Transportation Design Christian Allaire

Town of Portugal Cove – St. Philips Traffic Calming Policy

Harbourside was brought on as transportation engineers in 2016 to address traffic and pedestrian safety issues within the Town of Portugal Cove, St. Philips, Newfoundland. We developed a Traffic Calming Policy with the goal of assisting the Town of Portugal staff in managing traffic calming requests and addressing vehicular and pedestrian safety in a consistent manner. The proper application of the Traffic Calming Policy by town staff ensures that transportation throughout Portugal Cove is safer and more reliable.

Read More
Policy Development Christian Allaire Policy Development Christian Allaire

Town of Portugal Cove – St. Philip’s Speed Limit Policy

Harbourside Transportation Consultants was retained by the Town of Portugal Cove - St. Philips’s, Newfoundland, to develop a Speed Limit Policy, providing guidelines for establishing posted speed limits within the town. The intent of the policy was to ensure that safe speed limits are set, and to strike a balance between convenience, efficiency, energy conservation, and minimizing environmental impact. It outlines the procedure for the review of speed limits on an annual basis, which includes carrying out a program of speed and traffic volume data collection.

Read More
Traffic Study Christian Allaire Traffic Study Christian Allaire

Shannon Park Development Traffic Study

Harbourside Transportation Consultants was retained by the Canada Lands Company (CLC) in 2016 to prepare a traffic study for the redevelopment of Shannon Park in Dartmouth, Nova Scotia. Initial meetings took place with the CLC and the Halifax Regional Municipality (HRM) to confirm the scope of work, and Harbourside reviewed the base information and gathered traffic counts at eight intersections in the study area. We developed a series of recommendations for improvements to accommodate the redevelopment.

Read More
Traffic Study, Transportation Design Christian Allaire Traffic Study, Transportation Design Christian Allaire

Town of Bay Roberts Transportation Master Plan

The Town of Bay Roberts on the Bay de Verde Peninsula, Newfoundland, engaged Harbourside Transportation Consultants to prepare a comprehensive Transportation Master Plan (TMP). Growth in traffic volumes on the Conception Bay Highway had resulted in safety concerns from both residents and business owners with respect to property access. The scope of work for the TMP was divided into three tasks with multiple subtasks: understanding traffic and transportation systems, assessment of present and future conditions, and creating a system improvement plan.

Read More
Traffic Study Christian Allaire Traffic Study Christian Allaire

Memorial University Area Traffic Study

In 2016, the City of St. John’s, Memorial University, and the Provincial Department of Community Services in Newfoundland partnered together to undertake the Memorial University Area Traffic Study. The goal was to examine the longer-term transportation infrastructure and ensure that the road and pedestrian networks in and around Memorial University can continue to accommodate its growing population. Harbourside developed the unique methodology used during the traffic study, which had to be thorough, detailed, and future-focused.

Read More