Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Highway 102/107 Overpass
Bridge Christian Allaire Bridge Christian Allaire

Highway 102/107 Overpass

Harbourside Engineering provided the preliminary and detailed structural bridge and geotechnical design services for the highway 102 / Highway 107 overpass. This project was awarded the 2025 CISC Award for Excellence in Bridge Design.

Read More
Darnley Wharf and Breakwater Reconstruction
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Darnley Wharf and Breakwater Reconstruction

For this project, Harbourside was engaged as the prime consultant to complete the design of a replacement structure for an existing marginal wharf. In addition, we were responsible for the partial replacement of an existing breakwater, the design of an abutment for the gangway to the floating docks and the design of a new anchorage for the floating docks.

Read More
Naufrage Breakwater Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Naufrage Breakwater Reconstruction

Harbourside was engaged as the prime consultant to complete the design of a new breakwater to replace the existing breakwater structure. The existing breakwater was a timber piled structure, a concrete deck and armour stone below and at the end. The new structure is a steel sheet pile wall with a concrete deck and armour stone behind and at the end of the new breakwater.

Read More
Hall’s Harbour Wharf Replacement
Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Hall’s Harbour Wharf Replacement

Harbourside Engineering Consultants was hired to design a replacement structure for Hall’s Harbour wharf: a ground-out fishing wharf that is also heavily used by tourists during the summer and fall. Hall’s Harbour is also a popular location for observing tidal changes of the Bay of Fundy. Due to structural conditions, the existing wharf at this facility was considered unsafe for use.

Read More
North Lake Wharf Replacement
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

North Lake Wharf Replacement

For this project, Harbourside was engaged as the prime consultant to complete the design of a replacement structure for North Lake 426P. The project started with an inspection and assessment of the existing wharf structure. That inspection determined that the existing wharf was in poor condition and needed to be temporarily repaired prior that fall to ensure the wharf was ready for the spring lobster fishing season.

Read More