Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
Lower Don Bridge and Don Valley Parkway
Harbourside Engineering is acting as the specialist bridge erection engineer for the Don Valley Parkway Bridge. In addition, Harbourside was also responsible for the Lower Don Enabling Works, and quality verification engineering (both structural and geotechnical).
Hamilton Waterfront West Marine Wall Rehabilitation
In early 2018, Harbourside was approached by the Hamilton Waterfront Trust (HWT), to complete structural engineering design work for upgrades to the existing Hamilton Waterfront Piers 5, 6 & 7. For the majority of the near 1 km of marine wall to be rehabilitated, steel sheets were to be embedded into the existing clays with a tie & waler system for support at the top.
Meaford Bridge Rehabilitation Program
The 2018 Bridge Rehabilitation Program included the full rehabilitation of two, three-span, concrete rigid arch bridges and three concrete box culverts in the Municipality of Meaford, ON. Harbourside conducted detailed analysis of the structures, oversaw repairs and construction, and worked with environmental representatives to preserve Barn Swallow nesting conditions.

