Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Marine Engineering Christian Allaire Marine Engineering Christian Allaire

The Boathouse Retaining Wall Rehabilitation

The Boathouse is a popular summertime location for the citizens of Guelph, Ontario. In 2024, Harbourside was tasked with the rehabilitation of its retaining wall adjacent to the Speed River. The project included additional design services to rejuvenate the surrounding area as well. In 2026 the project won the OPWA award for structures under $2-million.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Bay of Quinte Skyway Bridge

The original Bay of Quinte Skyway Bridge was constructed in 1967. Though it had received some rehabilitation work in the 90s, it had been nearly 30 years since its last major maintenance project. Harbourside was hired to develop and design the erection sequence, erection methods, and temporary works. Early in its development, this project would earn the 2019 CISC Award of Merit in the category of Bridges.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Victoria Bridge Erection

The original Victoria Bridge, serving as the main connection between Old South and downtown London via Ridout street over the Thames River in Ontario, needed replacement. E.S. Fox Limited (ESF) was awarded the construction project and engaged Harbourside to provide erection and construction engineering services. The replacement of the bridge involved the removal of the two-span bridge and the construction of a twin-rib arch supporting structure along Ridout Street South. In 2024, the Victoria Bridge won the CISC steel design award for engineering excellence in Ontario.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Oshawa Wharf Condition Assessment

Harbourside Engineering Consultants was retained by the Hamilton-Oshawa Port Authority (HOPA) to complete a visual inspection program to aid their board assess several wharf structures within the Port of Oshawa. At a later date, Harbourside was awarded the contract to complete the detailed design and drawings for the proposed repairs of the existing wharf structures.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Hamilton Waterfront West Marine Wall Rehabilitation

In early 2018, Harbourside was approached by the Hamilton Waterfront Trust (HWT), to complete structural engineering design work for upgrades to the existing Hamilton Waterfront Piers 5, 6 & 7. For the majority of the near 1 km of marine wall to be rehabilitated, steel sheets were to be embedded into the existing clays with a tie & waler system for support at the top.

Read More
Demolition, Bridge Christian Allaire Demolition, Bridge Christian Allaire

Groundhog River Bridge Demolition

When the former Groundhog River Bridge, a vital piece of infrastructure on the Trans-Canada Highway in Fauquier, Ontario, approached the end of its service life, Harbourside was contracted in 2021 by Facca Incorporated to provide alternative options for demolition. Harbourside proposed a de-launch methodology that allowed for de-launch of the bridge superstructure on the approaches. Harbourside conducted a full analysis of the bridge during all phases of the demolition, as well as a full floating stability analysis for the barges supporting the bridge.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Fort York Pedestrian Bridge

Dufferin Construction was awarded a design-build contract for the design and construction of two pedestrian bridges in Ontario, providing a link between Stanley Park and the Western area of Fort York grounds. ES Fox was subsequently awarded the contract for the bridge steel superstructure erections, retaining Harbourside to complete the erection engineering. Construction began in 2015 and was completed in 2019, and Harbourside was awarded the Award for Excellence in Bridge Projects from the Canadian Institute of Steel Construction.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Meaford Bridge Rehabilitation Program

The 2018 Bridge Rehabilitation Program included the full rehabilitation of two, three-span, concrete rigid arch bridges and three concrete box culverts in the Municipality of Meaford, ON. Harbourside conducted detailed analysis of the structures, oversaw repairs and construction, and worked with environmental representatives to preserve Barn Swallow nesting conditions.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Burgoyne Bridge Erection

The Burgoyne bridge is one of three crossings that span Twelve Mile Creek. It is an important transportation artery for the Niagara area, Ontario. By 2010, it was recommended that the bridge be replaced, and Harbourside was contacted by Pomerleau and Structal as a subconsultant to handle construction phasing and unique launch and design approaches, which began in 2014. After completion in 2016, Harbourside was awarded the Award of Excellence at the Canadian Consulting Engineering Awards Gala for the project in 2017.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Seal Island Bridge Emergency Repair

The Seal Island Bridge Structure, or the Great Bras d’Or Crossing, in Victoria County, Nova Scotia, is the third largest bridge span in the province and a crucial link in the Trans-Canada Highway between Sydney and Baddeck. The NS Department of Transportation and Infrastructure Renewal consulted Harbourside to provide structural engineering services for the assessment of the three span continuous main span and rehabilitation of a damaged truss diagonal. Harbourside developed an innovative structural repair with detailed phasing drawings.

Read More
Bridge, Demolition Christian Allaire Bridge, Demolition Christian Allaire

East River & Sydney River Arch Bridges

Harbourside was engaged by the Nova Scotia Department of Transportation and Infrastructure Renewal to conduct full assessments on the East River Bridge in Sheet Harbour and the Sydney River Bridge in North Sydney, Nova Scotia. A cost-comparison between rehabilitation and replacement was put forward, deeming a full replacement as most effective option for both. Harbourside completed the detailed design of replacement structures for the two sites, along with providing construction engineering services for the demolition of the existing bridges.

Read More
Bridge, Demolition Christian Allaire Bridge, Demolition Christian Allaire

Shubenacadie River Bridge Replacements Project

The Shubenacadie River Bridges were in poor condition, so Harbourside Engineering Consultants produced detailed design and construction phasing drawings for the Nova Scotia Department of Transportation and Infrastructure Renewal. The project included a full assessment of the existing structures, and the resulting report presented three options to address the problems with the structures. Harbourside undertook the complete erection package for the replacement superstructures, the complete demolition design of the existing superstructures, and the detailed construction phasing.

Read More
Bridge, Highways and Roundabouts, Construction Support Christian Allaire Bridge, Highways and Roundabouts, Construction Support Christian Allaire

Highway 104 Twinning (Part 2)

As a part of a major initiative by the NS Department of Transportation and Infrastructure Renewal to twin Highway 104 through the town of Antigonish, Nova Scotia, Harbourside Engineering Consultants received the contract to design six major structures along the new alignment. Harbourside provided preliminary designs of various options for each structure and final designs with tender-ready documents. This monumental task was undertaken by various groups, working in conjunction as the Dexter Nova Alliance.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Vimy Memorial Bridge Erection

 

The Vimy Memorial Bridge (formerly the Strandherd Armstrong Bridge) is a multiple space-truss arch bridge that spans across the Rideau River in Ontario. The design of the bridge was completed by Parsons, while the general contractor for the project was Horseshoe Hill Construction. Harbourside Engineering Consultants provided the erection engineering for the project, completing the structure in July of 2014. The innovative design and erection method, designed by Harbourside, won the 2014 Engineers Nova Scotia Lieutenant Governor’s Award for Excellence in Engineering.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Fletcher Hebb Bridge Replacement

Dexter Construction was awarded the design-build contract for the demolition and replacement of the existing Fletcher Hebb Bridge in Bridgewater, Nova Scotia, for the NS Department of Transportation and Infrastructure Renewal. Harbourside Engineering was hired by both Dexter and Shaw Precast to carry out the design of the new bridge and provide construction engineering services. The project was completed on time, on budget, and within the seven-day permitted road closure.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Caribou Ferry Terminal (Part 2): Repairs and Upgrades

Harbourside completed an assessment of the existing condition of a variety of marine structures at the Caribou Ferry Terminal, an important access point between Prince Edward Island and the mainland in Caribou, Nova Scotia. Harbourside oversaw the assessment of various structures, including the steel sheet pile (SSP) walls, SSP caissons, and concrete cribs. Following the assessment, Harbourside Engineering completed repair prioritization and initial cost estimates for a variety of repairs required around the facility.

Read More