Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Marine Engineering, Geotechnical Investigation Christian Allaire Marine Engineering, Geotechnical Investigation Christian Allaire

Pier 20 West and Pier 21 Wharf Reconstruction

Harbourside was retained by the Port of St. John’s to provide engineering services for the Pier 20 West and Pier 21 Wharf Replacement and Upland Development project on the south side of St. John’s Harbour, Newfoundland. The primary objective of the project was the complete replacement of the existing wharves, the demolition of the existing building at the site, and the development of the upland area. Harbourside is providing contract administration and full-time onsite inspection services throughout the construction period.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Margaree Wharf Reconstruction

Harbourside Engineering was engaged by Small Craft Harbours, Fisheries and Oceans Canada (SCH) to develop the detailed design for the reconstruction of the finger pier wharf in Margaree, Newfoundland following damages during hurricane Fiona in the fall of 2022. The replacement design provides shore power and lighting along the length of the new pier and improvements to the facility to make it more resilient to extreme surge and wave events in the future.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Carmanville Wharf Reconstruction

Fisheries and Oceans Canada, Small Craft Harbours, engaged Harbourside to develop a tender package to reconstruct the small harbour wharf in Carmanville with a goal of accommodating larger Canadian Coast Guard vessels, upgrading fendering and mooring systems, and raising deck elevation to address sea level rise. This active commercial fishing facility acts as the Canadian Coast Guard’s primary port for the north coast of Newfoundland, and accommodates the Argentia Desgagnés, a 119m-long cargo ship supplying all road salt to the island.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Westport Wharf Reconstruction

Harbourside was engaged as the primary consultant by Small Craft Harbours, Fisheries and Oceans Canada to complete the planning, design, and contract administration for the reconstruction of the wharf in Westport, Newfoundland. After developing the construction documents, Harbourside Engineering completed the initial inspection of the existing structure, then completed all preliminary and detailed design work and tender preparation (including drawings, specifications, and cost estimate) for the replacement structure.

Read More
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Wharf Strengthening and Rehabilitation, Makkovik, NL

In 2019, Harbourside Engineering completed a third-party review for the Newfoundland Department of Transportation & Infrastructure for a new fender system for the existing ferry terminal wharf in Makkovik, Newfoundland. Based on the review, Harbourside Engineering recommended modifications to the tendered fender system design and additional strengthening measures, and completed a detailed design and a drawing package. Harbourside continued this cooperation through construction, as previously unknown issues were identified and had to be addressed.

Read More
Bridge Christian Allaire Bridge Christian Allaire

Juno Beach Memorial Pedestrian Bridge Erection

The Hunt Club pedestrian bridge was completed in 2014. Originally designed by another firm, multiple setbacks prompted the City of Ottawa to dismiss the original designer and retain Parsons to redesign the bridge. The in turn hired Harbourside as the bridge erection specialists.