Harbourside Engineering Group was recognized for their work on the Etobicoke Rail Bridge Replacement in the category of Transportation by the Canadian Consulting Engineer Awards. Retained by Construction Demathieu & Bard Canada, Harbourside lead the design of a modular gantry system that could rapidly and non-destructively replace whole bridge spans in a fraction of time that would normally be required with crane-based operations.
2026 CCE Awards Showcase: Accelerated Rail Bridge Replacement Using Modular Gantry
Previous
Previous
Two Wins for Harbourside at Engineer’s Nova Scotia Award Gala
Next
Next

