Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
Highway 104 Twinning (Part 3)
The Highway 104 Twinning Project was a Design, Build, Finance, Operate, and Maintain (DBFOM) project, including twinning the 100 series highway between Sutherlands River and Antigonish, Nova Scotia, with new interchanges and bridges. Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of bridge structures, and was awarded the 2025 Lieutenant Governor's Award for Excellence in Engineering for this project.
Burgoyne Bridge Erection
The Burgoyne bridge is one of three crossings that span Twelve Mile Creek. It is an important transportation artery for the Niagara area, Ontario. By 2010, it was recommended that the bridge be replaced, and Harbourside was contacted by Pomerleau and Structal as a subconsultant to handle construction phasing and unique launch and design approaches, which began in 2014. After completion in 2016, Harbourside was awarded the Award of Excellence at the Canadian Consulting Engineering Awards Gala for the project in 2017.
THE BIG LIFT: Angus L. MacDonald Redecking Project
The existing deck and stiffening truss of the Angus L. Macdonald (ALM) Bridge, spanning over the Halifax Harbour in Nova Scotia, were nearing the end of their service life and needed replacement. The project consisted of the design of the new suspended deck and stiffening truss, as well as the analysis of the bridge during erection and the design of the main erection equipment. Harbourside received the Lieutenant Governor’s Award for Excellence in Engineering in 2018 for its work on The Big Lift.
Northwest River Bridge Replacement
Public Works and Government Services issued a call for proposals in 2014 for the replacement of the Northwest River Bridge, located within Terra Nova National Park, Newfoundland. The project objective was to remove and replace the existing bridge and to realign the approaches on each side of the bridge to current NL-DOTW standards. Harbourside was also responsible for the design of the temporary sheet pile retaining walls along each approach, and the phasing for the extension of the golf course underpass structure immediately east of the river bridge.
Highway 104 Twinning (Part 2)
As a part of a major initiative by the NS Department of Transportation and Infrastructure Renewal to twin Highway 104 through the town of Antigonish, Nova Scotia, Harbourside Engineering Consultants received the contract to design six major structures along the new alignment. Harbourside provided preliminary designs of various options for each structure and final designs with tender-ready documents. This monumental task was undertaken by various groups, working in conjunction as the Dexter Nova Alliance.
Vimy Memorial Bridge Erection
The Vimy Memorial Bridge (formerly the Strandherd Armstrong Bridge) is a multiple space-truss arch bridge that spans across the Rideau River in Ontario. The design of the bridge was completed by Parsons, while the general contractor for the project was Horseshoe Hill Construction. Harbourside Engineering Consultants provided the erection engineering for the project, completing the structure in July of 2014. The innovative design and erection method, designed by Harbourside, won the 2014 Engineers Nova Scotia Lieutenant Governor’s Award for Excellence in Engineering.

