Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
Pointe-Sapin Shore Protection
Structures 404 and 405 at Pointe-Sapin wharf were deteriorated crib structures that required repair or replacement. Harbourside was engaged by the Department of Fisheries and Oceans, Small Craft Harbours to complete the planning, design, and contract administration for the rehabilitation of the two timber crib structures. Harbourside also upgraded the shore protection near the entrance to the Pointe-Sapin Harbour, New Brunswick, with additional breakwater along the easter face of the wharf to protect the harbour from the increased effects of climate change.
Petit Cap Wharf Reconstruction and Expansion
Small craft harbours are the heart of the Maritimes. In 2021, Harbourside was hired by DFO Small Craft Harbours through a Standing Offer to develop two separate tender packages. These were created in order to design and replace the existing marginal wharf structure for the Petit-Cap Harbour, New Brunswick.
Botsford Launching Ramp Replacement
Harbourside Engineering Consultants was hired by the Department of Fisheries and Oceans, Small Craft Harbours to design a replacement for the deteriorated launching ramp at Botsford Wharf in Murray Corner, New Brunswick. Harbourside’s scope of services included pre-design services, consisting of an initial site assessment and preliminary engineering design options, a detailed engineering design of the launching ramp replacement, and the onsite oversight of construction. The project was completed in the spring of 2024.
Saint-Édouard-De-Kent Containment Cell
A new containment cell for dredge spoils was needed at the Saint-Édouard-de-Kent Harbour in Kent County, New Brunswick. Public Services and Procurement and the Department of Fisheries and Oceans, Small Craft Harbours, retained Harbourside Engineering Consultants for this project in 2021. The initial work included a topographic survey of the site, a geotechnical investigation inclusive of test pits, collection of soils samples, and the development of a tender package to replace the existing containment cell.
Gateway Bridge Inspection Program
In 2011, Gateway Operations began an Operation, Maintenance, and Rehabilitation (OMR) program for the four-lane Route 1 highway in New Brunswick. Part of this program requires the bi-annual inspection of 245 structural assets. Starting in 2014, Harbourside Engineering Consultants has been responsible for the biennial inspections of these structures. This substantial stretch of highway is one of the most important corridors in the province, connecting Canada to the United States, and ending in an interchange with the Trans-Canada Highway.
Magaguadavic River Bridge Demolition
Harbourside Engineering Consultants was engaged to complete an engineered demolition plan to remove the center 40.5 m span of the existing Magaguadavic River Bridge close to Saint George, New Brunswick. Harbourside developed an innovative demolition technique where the structure was broken at mid-span to create two prop-cantilevered structures, which were then demolished by Dexter Construction with an excavator, located on the deck with a breaker attachment.

