Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
Pointe-Sapin Shore Protection
Structures at the Pointe-Sapin wharf were deteriorated and required repairs or replacement to ensure safe passage and use of this harbour. Harbourside was hired by DFO SCH to develop a tender package to rehabilitate and extend the life of these structures, while protecting the ecologically sensitive areas around the harbour.
Petit Cap Wharf Reconstruction and Expansion
Small craft harbours are the heart of the Maritimes. In 2021, Harbourside was hired by DFO Small Craft Harbours through a Standing Offer to develop two separate tender packages. These were created in order to design and replace the existing marginal wharf structure for the Petit-Cap Harbour, New Brunswick.
Botsford Launching Ramp Replacement
Botsford wharf is a fisheries harbour located in Murray Corner, New Brunswick. Harbourside Engineering Consultants was hired by DFO Small Craft Harbours to design a replacement for the existing launching ramp which was deteriorated and considered unsafe for use.
Saint-Édouard-De-Kent Containment Cell
Due to environmental requirements, a new containment cell for dredge spoils was needed at the Saint-Édouard-de-Kent Harbour in Kent County, New Brunswick. Public Services and Procurement and the Department of Fisheries and Oceans, Small Craft Harbours, retained Harbourside Engineering for this project in 2021.
Gateway Bridge Inspection Program
In 2011, Gateway Operations began an Operation, Maintenance, and Rehabilitation (OMR) program for the four-lane, 239 km Route 1 highway. Part of this program requires the bi-annual inspection of 245 structural assets, including overpasses, underpasses, water crossings, viaducts, culverts, retaining walls, and overhead sign structures.
Magaguadavic River Bridge Demolition
The existing Magaguadavic River Bridge was a 3 span continuous 3 cell cast in place reinforced concrete box structure. It spanned the Magaguadavic River close to Saint George, NB. This bridge was replaced with a new adjacent structure as part of the Gateway project twinning Route 1.