Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.
The Boathouse Retaining Wall Rehabilitation
The Boathouse is a popular summertime location for the citizens of Guelph, Ontario. In 2024, Harbourside was tasked with the rehabilitation of its retaining wall adjacent to the Speed River. The project included additional design services to rejuvenate the surrounding area as well. In 2026 the project won the OPWA award for structures under $2-million.
Carter’s Point Wharf 410 Reconstruction
Carter’s Point Wharf was an existing deteriorating structure requiring replacement, so Harbourside Engineering was hired by the Department of Fisheries and Oceans, Small Craft Harbours, to design the demolition and reconstruction work with a berlin wall structure. The project also included the engineering design and construction of a new launching ramp and containment cell to store the dredge materials created during construction. The project’s design phase was completed in 2023, with construction wrapping up in 2025.
Halifax International Airport Stand-by Parking Lot
Harbourside Transportation Consultants were retained by the Halifax International Airport Authority (HIAA) to complete a review of available options for stand-by parking and to develop a solution to provide additional spaces at the largest airport in Nova Scotia, the Halifax Stanfield International Airport. Harbourside Geotechnical Consultants also conducted the geotechnical investigation portion of this project for quality assurance and control at the project site.
Ocho Rios Berth 2 Rehabilitation
Harbourside was hired by the Port Authority of Jamaica (PAJ) to perform a condition assessment of the existing Berth 2 at the Ocho Rios Cruise Terminal in Jamaica, which was damaged by a cruise vessel in 2024. Harbourside Engineering Consultants assessed existing site conditions and assisted with design work, and Harbourside Geotechnical Consultants conducted various laboratory services. By condensing the design schedule, Harbourside helped to mitigate the social and economic impact on this region and restore functionality to the terminal as quickly as possible.
CCG SAR Geotechnical & Servicing Study
The Canadian Coast Guard engaged Harbourside to support the planning and design of a newly proposed CCG Search and Rescue Station (CCG-SAR) at the Freeport (South Cove) Small Craft Harbour on Long Island, Digby County, Nova Scotia. Along with allowing for larger vessels, the new SAR station will offer upgraded services and a larger dedicated berth. The placement of a new facility within Freeport also helps to make the station more accessible.
Port Lands Flood Protection and Redevelopment
Harbourside Engineering provided erection engineering services for the fabrication, transportation, and erection of four steel arch bridges for Waterfront Toronto, Ontario. Two of the new bridges cross the Keating Channel to replace the previous Cherry Street North Bridge, and the other two, on Cherry Street and Commissioners Street, cross the new river valley at the mouth of the Don River. Most of the work to build and coat these structures was completed in Nova Scotia, and they were later transported by barge to Toronto.
Highway 104 Twinning (Part 3)
The Highway 104 Twinning Project was a Design, Build, Finance, Operate, and Maintain (DBFOM) project, including twinning the 100 series highway between Sutherlands River and Antigonish, Nova Scotia, with new interchanges and bridges. Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of bridge structures, and was awarded the 2025 Lieutenant Governor's Award for Excellence in Engineering for this project.
Université Sainte-Anne Track and Field Facility
Harbourside was retained by Tate Engineering as part of the design of the Université Sainte-Anne track and field facility in Church Point, Nova Scotia. Harbourside provided recommendations and construction supervision to limit settlements and meet the strict track requirements despite the poor native soil conditions and low-quality fills on the site at the start of the work. Harbourside’s scope of work included carrying out a geotechnical test pit investigation, site inspection, and engineering recommendations for soft soil conditions.
Peggy’s Cove Infrastructure Improvements
Peggy’s Cove is one of Nova Scotia’s most iconic tourist attractions, drawing approximately 700,000 visitors annually. In recent years, the popularity of Peggy’s Cove has created issues in relation to crowds, traffic, servicing, and vehicular and pedestrian infrastructure. To address this, Develop Nova Scotia commissioned the Peggy’s Cove Master Plan, where Harbourside led the design, tendering and construction management of a variety of infrastructure improvements at Peggy’s Cove. Harbourside, in collaboration with Englobe Corporation, was named the 2023 recipient of the Nova Scotia Lieutenant Governor’s Award for Excellence in Engineering for this project.
Canada Border Services Agency Warehouse
Harbourside carried out a geotechnical investigation for the new Canada Border Services Agency container examination facility in Halifax, Nova Scotia. The project required multiple specializations, and Harbourside handled the project management in conjunction with the Halifax Port Authority. Harbourside Project Management acted as the owner representative for this project, the associated developments at the PSA maintenance garage, and the South End Container Crane Stowage Foundations, all of which were completed by 2023.
Pier C Terminal Expansion
Harbourside provided geotechnical and site services to the Halifax Port Authority related to the construction of the Pier C Extension for the Port of Halifax’s South End Container Terminal in Halifax, Nova Scotia, from 2018 to 2020. The purpose of the geotechnical investigation was to assess the subsurface soil and bedrock conditions at the site and to provide geotechnical recommendations to aid with the design and construction of the extension. This expansion will help create new jobs and provide further opportunity for growth throughout the Maritimes.
Wharf Strengthening and Rehabilitation, Makkovik, NL
In 2019, Harbourside Engineering completed a third-party review for the Newfoundland Department of Transportation & Infrastructure for a new fender system for the existing ferry terminal wharf in Makkovik, Newfoundland. Based on the review, Harbourside Engineering recommended modifications to the tendered fender system design and additional strengthening measures, and completed a detailed design and a drawing package. Harbourside continued this cooperation through construction, as previously unknown issues were identified and had to be addressed.
Hall’s Harbour Wharf Replacement
Harbourside Engineering Consultants was hired by Public Works and Government Services on behalf of the Department of Fisheries and Oceans, Small Craft Harbours, to design a replacement structure for the Hall’s Harbour Wharf in Nova Scotia. This structure would need to house three commercial fishing vessels, along with requiring updated lighting and electrical systems, as advised by RSEI Consultants Ltd. The project’s engineering design phase was completed by 2015, and construction finished in 2018.
Rocky Barachois Bridge Replacement Approach
Gros Morne, Newfoundland, continued its series of bridge replacement projects with a focus on the Rocky Barachois Bridge in 2016. Harbourside was contracted to provide detailed concept, design, and tender documents. Harbourside Transportation Consultants completed the design of the vertical and horizontal alignments, while Harbourside Geotechnical Consultants investigated the approaches at this site. The design of the new bridge was undertaken by Harbourside Engineering Consultants, making this project a truly comprehensive endeavour for the group.
Maritime Link
The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in 2017 to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. Harbourside worked on several phases of the Maritime Link Project, with involvement beginning with planning and extended to the completion of construction. The connection provided by the Maritime Link is one more step towards a greener future for Nova Scotia, who intends to be carbon net zero by 2035.
Highway 104 Twinning (Part 2)
As a part of a major initiative by the NS Department of Transportation and Infrastructure Renewal to twin Highway 104 through the town of Antigonish, Nova Scotia, Harbourside Engineering Consultants received the contract to design six major structures along the new alignment. Harbourside provided preliminary designs of various options for each structure and final designs with tender-ready documents. This monumental task was undertaken by various groups, working in conjunction as the Dexter Nova Alliance.