The journey behind the Port Lands bridges

“The point of the Port Lands Flood Protection Project was to be able to reclaim 240 acres of land from flooding and as part of this they basically created a new manmade island which required four new bridges to be installed,”

said Thomas McNutt, structural engineer with Harbourside Engineering Consultants, during a presentation at the Canadian Institute for Steel Construction’s conference in Toronto.


Read the Project Summary Here

Previous
Previous

Charlottetown city officials get look inside Simmons Sports Centre construction site

Next
Next

Repair or replace? Province set to weigh options for Seal Island Bridge in Cape Breton