“The point of the Port Lands Flood Protection Project was to be able to reclaim 240 acres of land from flooding and as part of this they basically created a new manmade island which required four new bridges to be installed,”
said Thomas McNutt, structural engineer with Harbourside Engineering Consultants, during a presentation at the Canadian Institute for Steel Construction’s conference in Toronto.

