Our Projects
Raising the Bar at Every Turn
Engineering Design and Innovation
Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Highway 104 Twinning (Part 3)
Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of all bridge structures, including inspection, rehabilitation, and replacement; geotechnical engineering design, soil testing, foundation testing, and inspection; and alignment and interchange designs.

Cornwall Interchange Design
In 2016, the Prince Edward Island Government requested funding from Ottawa to redirect the Trans-Canada Highway around the town of Cornwall. In the span of just 4 years (2009 to 2013), the area saw 159 collisions (none of them fatal). The project was to be completed in two phases. Enter Harbourside Transportation Consultants!

Seal Island Bridge Emergency Repair
The Seal Island Bridge Structure was constructed in 1961 in Victoria County, Nova Scotia. The Seal Island Bridge is the third longest bridge span in the province. NSTIR consulted Harbourside to provide structural engineering services for the structural assessment of the three span continuous main span and rehabilitation of the damaged truss diagonal located within the 500 ft. center arch span.
Bonnie Road Bridge Emergency Collision Repairs
The southernmost girders in the center of the bridge span were struck and significantly damaged by an excavator bucket on the flatbed of a truck travelling northbound at highway speeds. The damage on the girders was beyond repair and extended beyond the east pier and into the east side span.

Highway 104 Twinning (Part 2)
As a part of a major initiative by NSTIR to twin Highway 104 through the town of Antigonish, Harbourside received the contract to design six major structures along the new alignment.
Gateway Bridge Inspection Program
In 2011, Gateway Operations began an Operation, Maintenance, and Rehabilitation (OMR) program for the four-lane, 239 km Route 1 highway. Part of this program requires the bi-annual inspection of 245 structural assets, including overpasses, underpasses, water crossings, viaducts, culverts, retaining walls, and overhead sign structures.

Highway 104 Twinning (Part 1)
The twinning of Highway 104 was a massive undertaking. Various projects were completed by an alliance of engineers and construction contractors working to modernize 63 km of critical highway infrastructure. As part of this monumental effort, Harbourside completed the design of the twin overpass structures at Trunk 7 intersection.

Little Bras d’Or Cofferdam, Trestle and Bridge Replacement
Local tourism in the Little Bras D’Or area is dependent on the access provided by the Little Bras D’Or bridge. It acts as the only non-load related link to the Newfoundland ferry in North Sydney. As the bridge was in a deteriorated state, it was slated for replacement in 2010.