Our Projects

Raising the Bar at Every Turn

Engineering Design and Innovation

Every project that Harbourside undertakes is backed by our commitment to engineering excellence. Our work is characterized by thorough communication and comprehensive design. We see the whole picture. At every step, Harbourside redefines the meaning of quality engineering. With seasoned professionals from every sector of the industry, we are able to solve even the most technically challenging projects. Both throughout Atlantic Canada, and on the international stage, our work has been recognized by highest supervising bodies. The award-winning projects below are a testament to the calibre of the engineering performed at Harbourside.

Highway 104 Twinning (Part 3)

Highway 104 Twinning (Part 3)

Working as part of the Dexter Nova Alliance (DNA), Harbourside Engineering Group completed the design of all bridge structures, including inspection, rehabilitation, and replacement; geotechnical engineering design, soil testing, foundation testing, and inspection; and alignment and interchange designs.

Read More
Naufrage Breakwater Reconstruction
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

Naufrage Breakwater Reconstruction

Harbourside was engaged as the prime consultant to complete the design of a new breakwater to replace the existing breakwater structure. The existing breakwater was a timber piled structure, a concrete deck and armour stone below and at the end. The new structure is a steel sheet pile wall with a concrete deck and armour stone behind and at the end of the new breakwater.

Read More
Maritime Link
Geotechnical Investigation, Construction Support Christian Allaire Geotechnical Investigation, Construction Support Christian Allaire

Maritime Link

The Maritime Link Project involved the construction of hundreds of kilometers of power transmission infrastructure in order to allow Nova Scotia to import renewable energy from Muskrat Falls in Labrador. This project took shape after engaging with Mi’kmaq stakeholder, various environmental studies, and multiple surveys.

Read More
North Lake Wharf Replacement
Marine Engineering Christian Allaire Marine Engineering Christian Allaire

North Lake Wharf Replacement

For this project, Harbourside was engaged as the prime consultant to complete the design of a replacement structure for North Lake 426P. The project started with an inspection and assessment of the existing wharf structure. That inspection determined that the existing wharf was in poor condition and needed to be temporarily repaired prior that fall to ensure the wharf was ready for the spring lobster fishing season.

Read More