Harbourside Engineering Hired to Remove Collapsed Crane

Harbourside Engineering was hired as part of the team that removed the collapsed crane in Halifax Nova Scotia. The crane was located on South Park Street, and fell during Hurricane Dorian, September 2019. Keep up to date with the story here.

Timeline of Crane Collapse and Removal

Previous
Previous

Repair or replace? Province set to weigh options for Seal Island Bridge in Cape Breton

Next
Next

The Big Lift wins Nova Scotia Engineering Award